Español(Spanish Formal International)English (United Kingdom)
004.jpg
019.jpg
 
References / Experiences
Proposals and Project Management of oil & gas projects:

LGK Consulting and its employees can show a record of 15 years experience in proposal elaboration and project management in relation to pipeline construction and field developments of oil & gas projects (incl. EPC) as for example:

  • Several pipe diameters at Block 16 in Ecuador for MAXUS
    • Wellpad preparation
    • Flowlines
    • Trunklines
    • Fiber optic cable and 350 MCM
  • Slurry pipeline 10” in Brazil for PARAPIGMENTOS
    • 180km pipeline
    • Difficult access
    • River MOJU crossing of more than 700m (open cut)
  • Gas pipeline Córdoba-Badajoz 28” / 32” in Spain for ENAGAS
    • 150km pipeline
    • Inventive Hydrotest execution
  • Several pipe diameters Offshore at the lay barge BGL-1 in Brazil for PETROBRAS
    • 300km pipeline in total
    • Manual welding
    • Automatic welding and automatic ultrasonic weld inspection
    • Polyurethane filling of the space between the joints for beach approach purposes
  • Gas pipeline Bolivia-Cuiabá 18” in Bolivia / Brazil for ENRON
    • 620km pipeline
    • Swamp crossings
    • River and road crossings with HDD
    • Mountain/ridge crossings
  • GASYRG 32” in Bolivia for PETROBRAS BOLIVIA
    • 210km pipeline
    • Sand area crossing
    • Semi-automatic welding INNERSHIELD and automatic ultrasonic weld inspection
  • Pipeline network rehabilitation in Brazil for PETROBRAS
    • 2 years contract
    • Pipeline section substitutions of several diameters and materials
  • GASENE 26” in Brazil for SINOPEC / PETROBRAS
    • 200km pipeline
    • River and swamp crossings
    • Semi-automatic welding STT / OUTERSHIELD
  • Gas pipeline Campinas-Rio 26” in Brazil for CAMARGO CORREA / TOYO / PETROBRAS
    • 140km pipeline
    • Mountain/ridge crossings
    • River crossings with HDD
    • Construction in parallel to operating pipelines
  • OPAL 56” in Germany for WINGAS
    • Proposal for the sections 7+8, 13+14, 1+2, 3+4
    • 160km in total
  • Oil pipeline Ruwais-Taweelah 2x12” in UAE for CHEMAWEYAAT
    • Proposal for the pipelines and pump stations
    • 2x180km in total
  • Gas field development Margarita in Bolivia for REPSOL
    • Wellhead setup
    • Flowlines
    • Trunklines
  • Oil field development NC 186/NC115 in Libya for AKAKUS-REPSOL
    • Wellhead setup oil / water / water injection
    • Flowlines
    • Trunklines
    • OHTL